Just fill in the form below. The quote number top-right is already set for you — nothing to type there.
2
Amending a quote you already saved
Type its number in "Load existing quote" below and click Load. Make your changes, then Save — it updates that same quote (new version number).
3
Copying an old quote for a similar new job
Load it the same way as #2, but tick "Save as a new quote instead" before you save — the original stays untouched and you get a brand new quote number.
You never need to manually type or change a quote number — the form handles that for you in all three cases.
Connecting…
Not doing option 2 or 3? Skip this — just start filling in the form below for a new quote.
Champion Heating
Underfloor heating — quote working sheet (internal — for pricing review)
Quote —
UNDERFLOOR HEATING ONLY
Site & Contacts
Property
Requested by
Phone
Rooms & Zones —
Room
Area
Centres
Pipe (m)
Equipment & Materials
Item
Qty
Unit Cost
Unit Retail
Cost
Retail
Heating Mains (add-on, priced separately)
Item
Qty
Unit Cost
Unit Retail
Cost
Retail
Labour
Task
Hrs
Visits
Cost/hr
Retail/hr
Cost
Retail
Labour total
Price Breakdown
Section
Trade Cost
Chosen / Suggested
Underfloor Heating Only
Whole Cost
Chosen Price
Margin
Profit
Underfloor Heating and DHW
Whole Cost
Chosen Price
Margin
Profit
Underfloor Heating Add On Cost
Whole Cost
Chosen Price
Margin
Profit
Suggested price at margin (Underfloor Heating Only)
25% margin
30% margin
35% margin
Suggested price at margin (Underfloor Heating and DHW)
25% margin
30% margin
35% margin
Notes for Tony
Tony's Final Price
Price given to client: $__________________ + GST
Signed / initialled: ______________________
Reason if different from Chosen Price above: _______________________________________________
Notes from Tony
Zone/thermostat changes, redo requests, anything else for Sarah to rework —
1 Site & contacts
Not linked
Type an address and matches from your Properties table appear below automatically — click one to link. No match? Fill in suburb + postcode and Save will create a new Property record instead of leaving it as loose text.
Not linked
Not linked
Company field links/creates the Contacts record; first/last name are optional extra detail on that same record — leave blank if you only know the company.
2 Rooms, Infloor Pipework & Tie Wire
Room / area
Area (m²)
Pipe centres
Pipe length req. (m)
Total
0.0 m²
0.0 m
Pipe length = area × (1000 ÷ centres) — no wastage allowance (per Tony). Total zones = total pipe length ÷ 100m, rounded — not one zone per room line above (that's just your measurement list). Override the number if the rounding doesn't match reality (e.g. 1005m rounds to 10 zones, not 11). Feeds Manifold Kit(s) below.
Infloor pipe supply
Quick-check vs. your $/m² rule of thumb (pipe materials + Pipe Install labour):
—
Tie wire
Auto-calculated: total pipe length (m) × 0.014 — one tie every 400mm, not rounded up.
Installation labour
Category
Hrs/visit
Visits
Cost rate/hr
Retail rate/hr
Cost
Retail
Reference guide only (not auto-applied to the hours above): roughly 700m of infloor pipe ≈ 8 days for 1 worker. Heating Mains Install labour above covers the mains section now living in Step 10.
3 Heat Source Sizing, Supply & Installation
System type
Includes every Heatsource and Gas Boiler catalog unit. For pool or DHW dual-purpose units, use the dedicated pickers in Steps 6 and 7 instead — they keep this one clear so nothing's costed twice. If DHW replaces this pick, this section correctly shows $0 — the full unit cost lives in Step 6 instead.
Can't find it? Add a one-off unit
One-off for this quote only — doesn't touch the shared catalog. Still triggers the right auto-fittings below based on the system type picked (Gas Boiler = boiler fittings, Heat Pump = heat pump fittings). Add it to Materials & Price List properly later if it becomes a regular model.
Auto-added standard part (Gas flue set / Imported expansion tank)
Item
Qty
Unit Cost
Unit Retail
Total Retail
Other required parts (filter, controls, imported-unit extras, gas flue offset…)
Gas Boiler jobs: double-check flue length/offset, filter, and controls are covered. Imported heat pump units: this is also where to add any extra parts those cheaper units need that aren't in their base price.
One thermostat can control more than one zone (e.g. "Living + Dining"). List each physical thermostat once.
Accessories (probe, flush box…)
Wiring centre & electrical (auto-added when more than 1 thermostat)
Item
Qty
Unit Cost
Unit Retail
Total Retail
Floor probe + PVC flush box (1 per zone) add as soon as any thermostat is entered. Once there's more than 1 thermostat: an 8-zone wiring centre per manifold panel (Tony's spec — always 8-zone, one per panel, not sized to total zones), plus actuators, one shared enclosure, and 2 isolation switches + 2 cable glands per manifold panel. Untick any line's checkbox to leave it out for a custom panel.
Installation labour
No separate line here — Tony fits thermostats while he's fitting the heat pump, so add any extra time for that under Heat Source Install in Step 3 instead.
Zones required from Step 2: 0. Add one row per physical manifold — e.g. 18 zones is commonly two 9-zone manifolds stacked, not one 18-zone kit.
Module type
Cabinet
Zones
Matched kit
Cost
Retail
Accessories
Standard fittings (auto-added)
Item
Qty
Unit Cost
Unit Retail
Total Retail
2× Ivar 1" x 32/3 Straight Male per manifold, always. Heat Pump systems add 8× Elbow (2 at unit + 6 standard) + 6× Straight Coupler as a standing job total. Gas Boiler adds 4× Straight Male at the boiler plus the same standard 6× Elbow + 6× Coupler. Untick any line's checkbox to leave it out for a custom panel.
Installation labour
Category
Hrs/visit
Visits
Cost rate/hr
Retail rate/hr
Cost
Retail
6 DHW Add-on
Pulled from any catalog item with "Cylinder" in the name. Pair with a plain heat source unit in Step 3.
DHW upgrade cost (vs. plain floor-only unit)
This model does the floor heating too — Step 3's plain heat source pick has been cleared so it isn't costed twice. This section's Trade Cost/Retail below uses the full dual-purpose unit price (the amber box above is just a reference showing the incremental DHW cost).
Codes with a "D" (e.g. 8GUb12D11-3) are the Dual Purpose Floor+DHW line.
DHW plumbing add-on (auto-added)
Item
Qty
Unit Cost
Unit Retail
Total Retail
6× Ivar 32/3 x 32/3 Straight Coupler, 1× 25mm ball valve, 1× Grundfos UPS 25-60N (Stainless) circulation pump — added whenever a cylinder or dual-purpose DHW unit is selected above.
This model does the floor heating too — Step 3's Heat Source pick has been cleared so it isn't costed twice.
One unit does both jobs — the pool contractor pipes up to it, we don't do separate pool-side work.
8 Extra Materials Needed
Item
Qty
Unit cost
Unit retail
Line cost
Use this for anything that isn't a real catalog product — a one-off cost you just want to type a dollar figure against.
9 Extra Labour Needed
For quick quotes that don't fit the structured labour rows above — e.g. just replacing a heat pump, or an upgrade visit. Add as many rows as you need; each is hours/visit × visits × rate, same as everywhere else.
Description
Hrs/visit
Visits
Cost rate/hr
Retail rate/hr
Cost
Retail
10 Commission, Customer Education & Office/Admin
Category
Hrs/visit
Visits
Cost rate/hr
Retail rate/hr
Cost
Retail
11 Heating Mains
Leave installed rate blank to see materials cost only (not what to charge) — fill it in (e.g. 99) to price it as a real line. Cost/m shows in the dropdown for each option — compare Warm Surfaces vs. the Waterware Uponor coils before picking.
Drainage coil (auto-added — goes inside the mains pipe)
Item
Qty
Unit Cost
Unit Retail
Total Retail
Pipe L/Drainage Corrugated Unslotted, 500.65.30 — priced per metre off the 30m roll rate, with 20% wastage allowed (not bought as whole rolls).
That's pipe + drainage coil together, per metre of mains run. The combined trade cost/retail also flows into the "Rooms, Infloor Pipework" total in Step 2's footer, and appears as its own line in the Complete Price Breakdown Total below. Installation labour for the mains run is entered in Step 2's Installation labour table (Heating Mains Install row).
12 Site Visits
HQ is 56 Roberts Road, Matakatia, Auckland. Type the one-way km yourself (a quick Google Maps check). Visits total is auto-calculated as the sum of every Visits field entered across Steps 2–9 above, except Office/Admin — that's desk time, not a site visit, so it's excluded here.
Travel time (paid drive time, separate from vehicle $/km above)
Same visits count as above — this is the worker's paid time driving, on top of the vehicle running cost. Cost rate defaults from your Labour Rate Card ($85/hr), editable per quote.
Notes for Tony
13 Complete Price Breakdown Total
Section
Trade Cost
Chosen / Suggested Price
Underfloor Heating Only
Whole Cost
$0.00
Total Suggested Price
$0.00
Final Chosen Price
$
Final Margin
—
Final Profit
$0.00
25% margin
$0.00
30% margin
$0.00
35% margin
$0.00
Underfloor Heating and DHW
Whole Cost
$0.00
Total Suggested Price
$0.00
Final Chosen Price
$
Final Margin
—
Final Profit
$0.00
25% margin
$0.00
30% margin
$0.00
35% margin
$0.00
Final Chosen Price here just adds the Floor Only and Add On boxes below together — the margin figures above are a reference off the combined cost in case you'd rather think in one whole-job number and work backwards.
Underfloor Heating Add On Cost
Whole Cost
$0.00
Total Suggested Price
$0.00
Final Chosen Price
$
Final Margin
—
Final Profit
$0.00
Type your (or Tony's confirmed) price straight into the Chosen Price box on "Underfloor Heating Only" and "Add On Cost" — leave blank to use the suggested figure. "Underfloor Heating and DHW" always just adds those two together. Whatever's showing here is what gets saved as the quote's amount when you hit Save. All figures exclude GST.